Get Mystery Box with random crypto!

Explosives Engineers' Guide by Dyno Nobel These rules provid | Mining Eng ⚒

Explosives Engineers' Guide by Dyno Nobel

These rules provide a first estimate in the absence of any better data.
→ Blasthole diameter in mm ≤ 15 x Bench height (BH) in metres
→ Bench height (BH) in metres ≥ (Blasthole diameter (D) in mm)/15
→ Burden (B) = (25 to 40) x (D)
→ Spacing (S) = 1.15 x B (This gives an equilateral pattern)
→ Subdrill = (3 to 15) x D
→ Charge length (C) ≥ 20 D
→ Stemming ≥ 20 x D or (0.7 – 1.2) x B
→ Burden stiffness ratio = BH/B : 2 to 3.5 good fragmentation
→ Stemming material size = D/10 to D/20
(Angular material with minimum fines)

Source: Blasting and Explosives Quick Reference Guide – Dyno Nobel

@Mining_eng